Business Expansion - Ongoing Projects

1. Line IV Capacity Enhancement (Upgrade of Western Kenya Pipeline Extension Project).

Laying of a 14inch parallel pipeline 326km long from PS 21 to PS 27 and installation of new pumps at PS 21 and PS 24.

 

2. PS 14 MSP, DPK Pipeline upgrade project.

Replacing the existing 12 inch pipes tank outlet piping with 18 inch pipes for Motor Spirit Premium (MSP) and Dual Purpose Kerosene (DPK) at KOSF leading to the common suction header at the new 3no. AGO pump sets and re-configure discharge lines to allow paralleling of two pipelines to PS1 for multiproduct purpose.

 

3. Line 1 upgrade project.

Replacement of line 1.

 

4. Line 1 Third pump project

Installations of new third pump at 7 pump stations along Line 1 to allow 2 running and 1 standby arrangement (PS2 to PS8).

 

5. Kisumu Oil Jetty Project

Single pipeline to deliver petroleum products to lake vessels using a new pump to be installed for the mooring facility.